🌐 AI搜索 & 代理 主页
Skip to content

Conversation

@kaspersv
Copy link
Contributor

@kaspersv kaspersv commented Dec 11, 2025

Bump minimum CLI version for overlay analysis to reduce number of CLI versions in use. This PR will not be merged until CodeQL CLI v. 2.23.8 has been released and fully rolled out.

Risk assessment

For internal use only. Please select the risk level of this change:

  • Low risk: Changes are fully under feature flags, or have been fully tested and validated in pre-production environments and are highly observable, or are documentation or test only.

Which use cases does this change impact?

Workflow types:

  • Advanced setup - Impacts users who have custom CodeQL workflows.
  • Managed - Impacts users with dynamic workflows (Default Setup, CCR, ...).

Products:

  • Code Scanning - The changes impact analyses when analysis-kinds: code-scanning.
  • Code Quality - The changes impact analyses when analysis-kinds: code-quality.

Environments:

  • Dotcom - Impacts CodeQL workflows on github.com.

How did/will you validate this change?

  • Test repository - This change will be tested on a test repository before merging.

If something goes wrong after this change is released, what are the mitigation and rollback strategies?

  • Feature flags - All new or changed code paths can be fully disabled with corresponding feature flags.
  • Rollback - Change can only be disabled by rolling back the release or releasing a new version with a fix.

How will you know if something goes wrong after this change is released?

  • Telemetry - I rely on existing telemetry or have made changes to the telemetry.
    • Dashboards - I will watch relevant dashboards for issues after the release. Consider whether this requires this change to be released at a particular time rather than as part of a regular release.
    • Alerts - New or existing monitors will trip if something goes wrong with this change.

Are there any special considerations for merging or releasing this change?

  • Special considerations - This change should only be merged once certain preconditions are met. Please provide details of those or link to this PR from an internal issue.

This PR should only be merged after CodeQL CLI v. 2.23.8 has been released and fully rolled out.

Merge / deployment checklist

  • Confirm this change is backwards compatible with existing workflows.
  • Consider adding a changelog entry for this change.
  • Confirm the readme and docs have been updated if necessary.

@github-actions github-actions bot added the size/XS Should be very easy to review label Dec 11, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

size/XS Should be very easy to review

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants